acidity_113.jpg

Fast transformer oil testing, new customer discount, expert analysis

Results in as little as 48 working hours on eligible suites.
Download the order form now and claim 3 months of new-customer pricing.

Get the offer

Download and complete the transformer oil analysis order form to get started.

54,000+ successful transformer oil tests completed across Australasia

NATA-certified laboratory

Expert analysis and interpretation

Australia-wide service

Dedicated results platform at no extra cost

All oil analysis reports include testing results, trending and peer review.

Sampling kits are included in the oil analysis price.


machinemonitor® Oil Laboratory is trusted by Australia’s biggest companies with their critical transformer assets.

Get the offer

Fast turnaround now and for all your future oil testing.

As an additional benefit, machinemonitor® can provide results within 48 working hours for most standard testing.

As a new customer you’ll receive the 3-month introductory discount, 24/7 cyber-secure platform AND our express turnaround service.

The turnaround times remain for the lifetime of testing your transformer oil with us.

For larger sample volumes, turnaround is typically 4–5 working days.

TERMS: New-customer promotional pricing applies for 3 months. Prices exclude GST and freight. Promotional pricing available for 3 months from receipt of your first order.

Fast turnaround and 3 months of savings

As a new customer you’ll receive promo pricing and ongoing fast turnaround for future testing.

TERMS: Turnaround depends on sample quantity, required test suite, and suitable sample condition on receipt.

Get the Offer

Your transformer oil testing in 3 easy steps

1

Collect your samples

Oil syringe

Download and complete the form.

We’ll send you the test kit and video instructions to collect your samples. Plus our staff can answer any questions.

2

We test and analyse

Expert testing and analysis within 48 hours.

Your samples will be logged, tested and analysed in our NATA-certified facility within 48 working hours for eligible samples.

We compare results against aggregate results across our database for extra confidence.

3

Results are secure and online

Access results on the TxAnalyser® platform.

See your results via cyber-secure TxAnalyser® portal 24/7. Over time this builds an accurate picture of the health of your transformer.

Download and complete the form. Email it to our laboratory, then we’ll send you the test kit and video instructions to collect your samples.

Get the Offer

Frequently Asked Questions

acidity testing

All the transformer oil testing services you need in one place

machinemonitor® provides a comprehensive range of transformer oil testing services through our NATA-certified Oil Laboratory, helping you detect developing faults early, assess oil condition and make better maintenance decisions.

Oil Quality

Our oil quality testing schedule will give you a complete picture of your transformer assets reliability and longevity.

Dissolved Gas Analysis

DGA evaluates the transformer's internal health by serving as a reliable early warning indicator of potential faults within the transformer's system.

Furan Analysis

This test indicates the extent of thermal wear on cellulose components within your transformers and estimates your transformer’s lifespan by assessing the transformer insulation’s condition.

Full list of laboratory testing available

  • Dissolved Gas Analysis (ASTM D3612)

  • Interfacial Tension of Oil Against Water (ASTM D971)

  • Acid & Base Number by Color-Indicator Titration (ASTM D974)

  • Colour of Petroleum Products (ASTM D1500)

  • Visual Inspection of Used Electrical Insulating Oils (ASTM D1524)

  • Moisture Content (ASTM D1533)

  • Furanic Compounds by HPLC (ASTM D5837)

  • Determination of Dielectric Breakdown Voltage (AS1767-2.1)

  • Corrosive sulfur test - Copper Corrosion (ASTM D1275B)

  • Corrosive sulfur test - Copper and Paper Corrosion (IEC 62535)

  • Corrosive sulfur test - Silver Corrosion (DIN 51353)

  • Dissipation factor (ASTM D924 / ASTM D1169 / IEC 60247)

  • Resistivity (ASTM D1169)

  • Inhibitor Content (ASTM D2668)

Get the Offer

Get fast transformer oil testing, a new-customer discount and expert analysis today.

✓ 3 months of introductory pricing

✓ 48 working hour turnaround on eligible suites

✓ Online results and analysis platform included

Get the Offer

How to get the offer now

Complete this quick form and we’ll be touch shortly to get you started with this offer through our order process.

If your order if urgent please contact our lab directly on 1300 736 091.